Resources search results "Team"

Mining, Process Plant, Maintenance & Safety Training
PERFORMANCE ASSOCIATES INTERNATIONAL
Excellence in Mining, Process Plant, Maintenance, and Safety Training Performance Associates International, Inc. (PAI) is the world leader in online and on-site training for the mining industry. We provide organizations with a single source for assessments, skills training, continuing education, safety training and compliance mandates, and more. Our first-class content guides your staff to gain the critical knowledge they need to work safely and efficiently today. Our proven, leading-edge industrial training programs improve performance in existing operations and ensure success during the start-up of new operations. Our training programs have saved companies millions in personnel accident prevention, production loss, and equipment damage. We partner with our customers and consult collaboratively to provide the analysis and content development to meet your needs. Services PAI Offers Plant Operator TrainingOur three-tier concept for effective plant operator training starts with fundamental knowledge and progresses to plant-specific concepts that are reinforced through detailed animations and interactive simulations. Maintenance TrainingWe custom build state-of-the-art maintenance training programs using exploded graphics, explanatory text, detailed procedures, and management systems. Mobile Equipment Operator TrainingOur first-class training program focuses on operator controls and indicators, safety, and performance optimization. It also includes operating, emergency, and troubleshooting procedures.Commissioning and Start-UpWe can identify, track, and control the thousands of activities that must occur for the successful commissioning and start-up of a process plant. There is no shortcut to a successful start-up.Testing and Tracking SystemsWe can help manage and track the performance of employees to improve the overall performance of the mine and plant industrial training programs. Our testing and tracking systems provide invaluable assistance in safety and operational compliance. Introductory and Safety TrainingOff-the-shelf introductory and safety training packages are an excellent source for mine and plant industrial training courses. They provide fundamental knowledge and basic training concepts. Now offering online courses!E-Learning, Animations, and SimulationsOur interactive e-learning keeps trainees focused and engaged. Our experienced in-house multimedia team develops state-of-the-art graphics, virtual and mixed reality training, stunning 3D animations, and technically engineered simulations of real-world scenarios.Other ServicesWe also provide many services relevant to planning, analyzing, and evaluating process plants, including:·         Operations readiness plan.·         Planning studies.·         Quality management.·         Systems implementation.·         Statistical process control.·         Reliability-based asset management.·         Productive capacity studies.·         Surveys and needs analyses.·         Economic life analysis.·         Process control strategies and methods.·         Debottlenecking and process optimization.·         Spare parts inventory and analysis.·         Feasibility studies.·         Consulting assistance.Consulting * Gap Analysis * Content Development * LMS * On-Site * Train-the-Trainer * E-Learning * Process Plant Optimization * Training * Safety * Mine Training * Plant Operator Training * Maintenance * Mobile Equipment * Competencies * Commissioning
Mining, Process Plant, Maintenance & Safety Training
PERFORMANCE ASSOCIATES INTERNATIONAL
Excellence in Mining, Process Plant, Maintenance, and Safety Training  Performance Associates International, Inc. (PAI) is the world leader in online and on-site training for the mining industry. We provide organizations with a single source for assessments, skills training, continuing education, safety training and compliance mandates, and more. Our first-class content guides your staff to gain the critical knowledge they need to work safely and efficiently today.  Our proven, leading-edge industrial training programs improve performance in existing operations and ensure success during the start-up of new operations. Our training programs have saved companies millions in personnel accident prevention, production loss, and equipment damage. We partner with our customers and consult collaboratively to provide the analysis and content development to meet your needs.  Services PAI Offers  Plant Operator Training Our three-tier concept for effective plant operator training starts with fundamental knowledge and progresses to plant-specific concepts that are reinforced through detailed animations and interactive simulations.  Maintenance Training We custom build state-of-the-art maintenance training programs using exploded graphics, explanatory text, detailed procedures, and management systems.  Mobile Equipment Operator Training Our first-class training program focuses on operator controls and indicators, safety, and performance optimization. It also includes operating, emergency, and troubleshooting procedures. Commissioning and Start-Up We can identify, track, and control the thousands of activities that must occur for the successful commissioning and start-up of a process plant. There is no shortcut to a successful start-up. Testing and Tracking Systems We can help manage and track the performance of employees to improve the overall performance of the mine and plant industrial training programs. Our testing and tracking systems provide invaluable assistance in safety and operational compliance.  Introductory and Safety Training Off-the-shelf introductory and safety training packages are an excellent source for mine and plant industrial training courses. They provide fundamental knowledge and basic training concepts. Now offering online courses! E-Learning, Animations, and Simulations Our interactive e-learning keeps trainees focused and engaged. Our experienced in-house multimedia team develops state-of-the-art graphics, virtual and mixed reality training, stunning 3D animations, and technically engineered simulations of real-world scenarios. Other Services We also provide many services relevant to planning, analyzing, and evaluating process plants, including: ·         Operations readiness plan. ·         Planning studies. ·         Quality management. ·         Systems implementation. ·         Statistical process control. ·         Reliability-based asset management. ·         Productive capacity studies. ·         Surveys and needs analyses. ·         Economic life analysis. ·         Process control strategies and methods. ·         Debottlenecking and process optimization. ·         Spare parts inventory and analysis. ·         Feasibility studies. ·         Consulting assistance. Consulting * Gap Analysis * Content Development * LMS * On-Site * Train-the-Trainer * E-Learning * Process Plant Optimization * Training * Safety * Mine Training * Plant Operator Training * Maintenance * Mobile Equipment * Competencies * Commissioning  
Top 3 Issues That a Top-Notch Mobile Sales Solution Will Address
Command Alkon
Spend More Time in the Field Generating Business Mobile technology that allows real-time information to be collected and shared is changing the face of the construction industry. This technology is being used to track daily activities and critical information, and streamline collaboration between teams in the field and at the office. What's shaking up sales processes in the technology world? Mobile sales solutions. Many sales people love their current manual or isolated quoting processes because they’re easy and have very few constraints. However, the rest of the organization often suffers from the headaches resulting from the lack of visibility or audit trails inherent to these processes, which ultimately negatively impacts your organization’s operational stability and growth plans. If this sounds like your organization, it may be time to investigate automated solutions that are designed specifically for the Heavy Building Materials industry that can empower accurate sales forecasting and minimize quoting inaccuracies. What Can A Mobile Sales Solution Do for My Business? Three problems that a mobile sales solutions address includes: 1) Generating timely and accurate quotes: Roughly 25% of Heavy Building Materials production volume is quoted and shipped within 24 hours. Without real-time information, there is room for unintended errors to easily creep into the process; such as outdated pricing and unauthorized discounts. According to well-regarded research firms, these rebills can cost companies up to 5% of the original transaction value. Progressive Ready-Mix Producers and Bulk Material Suppliers are using mobile sales solutions to more effectively perform quoting, monitoring, and forecasting through an investment that can easily pay for itself by eliminating just a handful of credit and rebill situations. 2) Maintaining realistic pipeline estimates and forecasts: Recent research by the Aberdeen Group shows that only around 55% of companies that do not implement a best-in-class forecasting process achieve their sales quotas, compared to 97% of companies that choose to implement advanced forecasting approaches achieving theirs. With a sales solution in place that provides real-time visibility into both an accurate backlog and an accurate sales forecast, you are empowered to make decisions and adjustments that steer your organization in the right direction on a daily basis (even a hourly basis, if needed) instead of relying on a monthly snapshot of quickly outdated information.  3) Missing opportunities due to lack of visibility in the field: How often does your company miss opportunities simply because a bid date is missed?  Does each sales team member have their own approach to selling, quoting, and closing opportunities?  Is pricing consistency a problem you deal with? With a mobile sales solution designed specifically for the industry in place you can gain the visibility you need to monitor and enforce sales activities and ensure a consistent and professional buying experience to your market. MOBILEsales is Command Alkon’s mobile sales solution for the Heavy Building Materials industry. This tool helps you standardize your sales approach across your team and eliminate issues that arise from inaccuracies and inefficiencies.
Delivery Information Available at the Touch of a Button
Command Alkon
This year has truly blown by. It’s hard to believe that it’s already August – which means it’s practically Christmas, right? I have a very large family, so usually around this time is when I start to budget and plan for Christmas shopping. I have a difficult time in large crowds, so the hustle and bustle of Christmas shopping in the mall isn’t my thing whatsoever. I prefer staying home in my PJs and shopping around on my favorite app – Amazon. Despite my early jump on the holidays, there are ALWAYS those few friends or family members that I forget about – perfect opportunity for Amazon! While I’m shopping around for a gift, the app gives me an estimate of when my goods will be delivered before I hit “purchase.” Real-time tracking gives me peace of mind to know that everything I ordered will be here before Christmas. Business is all about the customer: what the customer wants and what they get. I’m always a very satisfied customer when I use Amazon, and that’s why I continue to do so. I love constantly receiving information about the goods that I’ve purchased and having confidence that they will be delivered to me when I need them. What if you could also provide your customers with an experience that sets you apart from your competition? What if you too could offer a way for your customers to feel empowered during the order and delivery process? MOBILEjobsite can work for your business in ways that Amazon works for me. Your customer can receive dispatch data in real-time, regardless of their location. Like my Amazon app, this tool is an easy-to-navigate app that gives the user information on orders scheduled for today, upcoming orders for future days, real-time truck locations, load-level summaries of completed and upcoming orders, notifications when a load is on the way to your site, and records of load status times. A consumer survey conducted by Convey, a team of supply chain and technology professionals, showed that the customer forms impressions about the brand throughout the purchase experience, and these impressions are reaffirmed or destroyed by the experience they receive through the delivery process. To succeed, customer loyalty must be a core focus. Gain a competitive advantage by efficiently improving the delivery experience.
Gain a Competitive Advantage by Efficiently Improving the Delivery Experience
Command Alkon
This year has truly blown by. It’s hard to believe that it’s already August – which means it’s practically Christmas, right? I have a very large family, so usually around this time is when I start to budget and plan for Christmas shopping. I have a difficult time in large crowds, so the hustle and bustle of Christmas shopping in the mall isn’t my thing whatsoever. I prefer staying home in my PJ's and shopping around on my favorite app – Amazon.Despite my early jump on the holidays, there are ALWAYS those few friends or family members that I forget about – perfect opportunity for Amazon! While I’m shopping around for a gift, the app gives me an estimate of when my goods will be delivered before I hit “purchase.” Real-time tracking gives me peace of mind to know that everything I ordered will be here before Christmas.Business is all about the customer: what the customer wants and what they get. I’m always a very satisfied customer when I use Amazon, and that’s why I continue to do so. I love constantly receiving information about the goods that I’ve purchased and having confidence that they will be delivered to me when I need them. What if you could also provide your customers with an experience that sets you apart from your competition? What if you too could offer a way for your customers to feel empowered during the order and delivery process?MOBILEjobsite can work for your business in ways that Amazon works for me. Your customer can receive dispatch data in real-time, regardless of their location. Like my Amazon app, this tool is an easy-to-navigate app that gives the user information on orders scheduled for today, upcoming orders for future days, real-time truck locations, load-level summaries of completed and upcoming orders, notifications when a load is on the way to your site, and records of load status times.A consumer survey conducted by Convey, a team of supply chain and technology professionals, showed that the customer forms impressions about the brand throughout the purchase experience, and these impressions are reaffirmed or destroyed by the experience they receive through the delivery process. To succeed, customer loyalty must be a core focus. Gain a competitive advantage by efficiently improving the delivery experience.
Interested in BIG Productivity Gains? Wipe Out Non-Productive Driver and Fleet Time
Command Alkon
There’s some good, solid news for the construction industry: Dodge Data & Analytics Index projects that we’ll have “moderate strengthening” through the end of 2018. But in terms of productivity, we appear to be heading in a different direction. Of note, a recent survey of 600 global construction leaders* compiled by PlanGrid and FMI Corporation mentions: ·         Poor communication, rework and bad data management cost the construction industry; $177 billion annually in labor costs in the United States alone. ·         Construction workers lose almost two full working days per week solving avoidable issues and searching for project information. ·         Each construction project team member spends more than 14 hours weekly on average dealing with conflict, rework and other issues. ·         Almost half of all rework is due to poor communication among project stakeholders, and poor project information, while 26% of rework is due to poor communication or miscommunication between team members caused unresponsiveness of team members; the inability of project stakeholders to collaborate effectively; and the lack of a common platform for all team members to communicate and share project data. ·         The most common goals for technology adoption included providing better access to project data, improving project productivity and increasing the accuracy of project information. ·         Workers are not taking full advantage of mobile devices and IT investments. Stamp Out Non-Productive Driver and Fleet Time for Big Productivity Gains It stands to reason that companies who address productivity issues will not only avoid scrambling for information and wasted hours and energy but also quickly gain competitive advantage. If you’re managing drivers and trucks that wheel in and out of numerous sites during the day or week and aren’t using automatic processes via technology to more efficiently track and manage your fleet, there’s more good news. You can increase driver productivity and avoid the 20-40 minutes per truck per day that’s lost through clocking in and out and other non-productive activities during: ·         Time in Transit ·         Time at the Job Site ·         Time in the Yard Forty minutes per day, per truck may seem marginal at first glance. But 200 minutes/week x 48 weeks/ year = 9,600 minutes, 160 hours or a total of 4,000 hours of inefficiency for a fleet of 25 trucks. Time in the yard is the lever most within a producer’s control and represents over half of the total nonproductive time per truck. So, rather than simply adding incremental trucks and drivers to the fleet to boost productivity (which unfortunately only adds to the total non‐productive hours and fails to improve operational processes), consider a solution that: ·         Uses automatic processes via technology to more efficiently track and manage your fleet. ·         Enables your drivers to punch the clock from in the cab, an efficiency enhancer that alone could save you up to 20 minutes per day (this is time spent in your own yard, under your own watch, that you can act on quickly to recapture those minutes, regardless of what happens away from your yard). ·         Captures a meaningful portion of that lost time from each driver. ·         Provides a constant view into the location and performance of your entire fleet. ·         Is adaptable and helps your teams collaborate in real-time with a “central source of truth” and access to relevant data when you need it. At least 50% of employees’ non‐productive time can be captured back efficiently and effectively when the right combinations of levers are pulled – both in terms of area of focus (i.e., time in yard) and adaptability to each individual customer’s business process requirements. This equates to big productivity increases over both the short- and long-term. Learn more about how Command Alkon’s TrackIt solution offers an industry specific, flexible and fully customizable solution to track your fleet and meet your specific needs, including in-cab time and attendance functionality focused at recapturing lost time in the yard, helping you drive a more efficient fleet and improve your profitability. *500 respondents from the United States and 99 from Australia, New Zealand, United Kingdom and Canada. Of those surveyed, 49% work for general contractor firms, 36% came from specialty trades and 15% were owners. Over 300 respondents came from the commercial sector and the other respondents represent industrial and manufacturing, heavy civil, healthcare, power (oil and gas, and energy), education and government.
Interested in BIG Productivity Gains? Wipe Out Non-Productive Driver and Fleet Time
Command Alkon
There’s some good, solid news for the construction industry: Dodge Data & Analytics Index projects that we’ll have “moderate strengthening” through the end of 2018. But in terms of productivity, we appear to be heading in a different direction. Of note, a recent survey of 600 global construction leaders* compiled by PlanGrid and FMI Corporation mentions: ·        •Poor communication, rework and bad data management cost the construction industry; $177 billion annually in labor costs in the United States alone.        •Construction workers lose almost two full working days per week solving avoidable issues and searching for project information. ·       • Each construction project team member spends more than 14 hours weekly on average dealing with conflict, rework and other issues. ·         •Almost half of all rework is due to poor communication among project stakeholders, and poor project information, while 26% of rework is due to poor communication or miscommunication between team members caused unresponsiveness of team members; the inability of project stakeholders to collaborate effectively; and the lack of a common platform for all team members to communicate and share project data. ·        •The most common goals for technology adoption included providing better access to project data, improving project productivity and increasing the accuracy of project information. ·        •Workers are not taking full advantage of mobile devices and IT investments.      Stamp Out Non-Productive Driver and Fleet Time for Big Productivity Gains It stands to reason that companies who address productivity issues will not only avoid scrambling for information and wasted hours and energy but also quickly gain competitive advantage. If you’re managing drivers and trucks that wheel in and out of numerous sites during the day or week and aren’t using automatic processes via technology to more efficiently track and manage your fleet, there’s more good news. You can increase driver productivity and avoid the 20-40 minutes per truck per day that’s lost through clocking in and out and other non-productive activities during: ·         •Time in Transit ·         •Time at the Job Site ·         •Time in the Yard Forty minutes per day, per truck may seem marginal at first glance. But 200 minutes/week x 48 weeks/ year = 9,600 minutes, 160 hours or a total of 4,000 hours of inefficiency for a fleet of 25 trucks. Time in the yard is the lever most within a producer’s control and represents over half of the total nonproductive time per truck. So, rather than simply adding incremental trucks and drivers to the fleet to boost productivity (which unfortunately only adds to the total non‐productive hours and fails to improve operational processes), consider a solution that: ·         •Uses automatic processes via technology to more efficiently track and manage your fleet. ·         •Enables your drivers to punch the clock from in the cab, an efficiency enhancer that alone could save you up to 20 minutes per day (this is time spent in your own yard, under your own watch, that you can act on quickly to recapture those minutes, regardless of what happens away from your yard). ·         •Captures a meaningful portion of that lost time from each driver. ·         •Provides a constant view into the location and performance of your entire fleet. ·        •Is adaptable and helps your teams collaborate in real-time with a “central source of truth” and access to relevant data when you need it. At least 50% of employees’ non‐productive time can be captured back efficiently and effectively when the right combinations of levers are pulled – both in terms of area of focus (i.e., time in yard) and adaptability to each individual customer’s business process requirements. This equates to big productivity increases over both the short- and long-term. Learn more about how Command Alkon’s TrackIt solution offers an industry specific, flexible and fully customizable solution to track your fleet and meet your specific needs, including in-cab time and attendance functionality focused at recapturing lost time in the yard, helping you drive a more efficient fleet and improve your profitability. *500 respondents from the United States and 99 from Australia, New Zealand, United Kingdom and Canada. Of those surveyed, 49% work for general contractor firms, 36% came from specialty trades and 15% were owners. Over 300 respondents came from the commercial sector and the other respondents represent industrial and manufacturing, heavy civil, healthcare, power (oil and gas, and energy), education and government.
Get More Performance Out Of Your Crusher
Stedman Machine Company
Get More Performance Out Of Your Crusher impactor maintenanceThere’s an urban legend out there about the company whose maintenance crew mistakenly installed a new crusher with the rotor spinning backwards. It still worked! And you think you have issues? To get the most from your equipment investment, you need to put in the time. Yes, a crusher costs a bit more than your average automobile, but that doesn’t mean it’s maintenance-free. An automobile needs oil changes too, right? Performing regularly scheduled maintenance on impact crushers is crucial for guaranteeing day-to-day reliability and optimum product output. Did you know you can boost output and quality by doing just a little bit more? Even daily cleanups and inspections can increase service life. It’s a no-brainer, though possibly easier said than done. Here are some steps and practices to incorporate in your ongoing operations and maintenance. Beginning with maintenance team education, parts logs, and general maintenance record keeping, plus troubleshooting, these guidelines will help your crusher go the distance. Training: Proper training for consistent maintenance is one of the most fundamental requirements for successful, reliable production. Begin with the crusher’s operation and maintenance manual. Incorporate the manual’s suggested routine maintenance schedule into the maintenance team’s duties. Appoint a “lead person” for each crusher as the go-to for that machine. This person is the historian for the unique operational adjustments the producer has incorporated for raw feed and product requirements. Daily log (document the following every 8 hours): Amperage draw: See if it changes from day to day. If amperage is exceeding normal levels, it could be a signal of bearing problems, loose belts, or general feed issues. Coast-down time: You’re going to need to know (and log) how long it takes the machine to come to a complete stop after shutdown. Here’s why: If the time starts to shorten, this could indicate a bearing problem. Oil pressure: You’ll want to record performance in a variety of operating conditions. This will allow you to identify trends and help to detect problems before they cause costly damage or downtime. Daily maintenance (every 8 hours): Check oil level, sight glass, grease appearance, and other lubrication schedules. Check high temperature or low hydraulic pressure indicators and switches. Check wear parts. Tighten bolts. Inspect belts. Remove dirt and debris from crusher frame surfaces and areas around the machine. Check intake/discharge chutes for any obstructions and/or build up. Check alarms. If electrical changes are made or programs are altered in automated systems, verify that all alarms and interlocks function properly. Don’t be afraid to replace switches or timers that appear damaged or are in poor condition. This is more economical than a major overhaul, but never disable or alter any alarms or interlocks! Lubrication: Completely drain and thoroughly clean out the inside of the oil tank (if you have one) to eliminate any contaminants before refilling. Find contaminant sources. Contaminants such as dust particles and water can get in where oil leaks out. Inspect hydraulic systems and tag any leaks for corrective action on the very next maintenance cycle. Use the proper grade of oil. Use the proper specification of filters. Keep the oil breathers clean. Understand grease versus oil lubrication. Grease requires less-intensive maintenance than that of oil-lubricated systems. Automatic oil lubrication systems or sealed cartridge bearings are for higher speed crushers like vertical shaft impactors, air swept fine grinders, or high-speed cage mills. Most horizontal shaft impactors, hammer mills, and cage mill applications are below 1,000 rpm and grease is sufficient. Maintain a scheduled oil sampling program. By creating a baseline of normal wear, it helps indicate when abnormal wear or contamination is occurring. The exact condition of a mechanical assembly is reflected in the oil. Belts: Inspect V-belt drives for damaged belts or loose belt tension. By replacing cracked, glazed, torn, or separated belts, plus maintaining proper belt tension, you’ll optimize your plant’s performance. Wear parts: Don’t overextend wear parts. Avoid running them so long that they become too worn. You may find that you can no longer rotate breaker bars or interchange wear plates to lower wear areas — and now, you’ve lost half of the wear. Guards: Rubber and chain curtains located in the feed and discharge openings of the crusher are subject to wear and tear. Since they are a first line of protection, it’s important to inspect them regularly and to establish a schedule of regular maintenance. Electrical: When (or if) electrical changes are made, you’ll need to verify that all alarms and interlocks still properly function. Same goes for programs when altered in automated systems. Always check with the manufacturer before making any modifications. Spares recommendation: Keep the recommended spares on hand and order replacements as soon as they are used. A list of recommended spares may be included with your equipment operations manual. If not, contact the manufacturer for recommendations. Update your equipment: All equipment evolves, and the recommended manufacturer upgrades are a good investment for increased life and better crusher performance. Check with the manufacturer for any possible updates. Unapproved modifications: Manufacturer design engineers have considerable field experience, which helps them as they calculate the design and perform prototype testing. Their engineering tasks include calculating bearing loads and bearing clearances. They’ve also worked to maximize throughput by establishing the most efficient speed and setting combinations to optimize impact on the material undergoing reduction. So when plant personnel suggest modifications that alter the intended design, these changes will more than likely hurt the purpose of the original design. As a result, you’ll have a less productive and reliable crusher due to potential damage and overload. Since the manufacturer has a vested interest in how well the crusher performs, contact them before making any modifications Cage Mill Operation and Maintenance Requirements for optimum production and wear part utilization include the following: sleeve wear patterns cage wear pattern identification To increase multi-cage sleeve life, cage rotation should be reversed regularly, if possible. (Some cage mills can be reversed, while others cannot.) By reversing the cage direction, sleeves will be worn from both sides, thus extending wear life. Wear parts: Index and or replace sleeves periodically. Inspect or replace hopper ring and shaft protector, if needed. Cage rebuilding is an option. Bearings: Follow the manufacturer’s recommended specifications and schedule for lubrications, temperature, and vibration ranges of spherical roller bearings in pillow block housings. Horizontal Shaft Impactor Operation and Maintenance Variables affecting product gradation include the following: Rotor speed – Higher rotor speeds produce finer product output.Breaker bar wear & new edges crush finerBreaker bar changes. Apron gap settings – Closer gaps retain the feed longer producing a finer product. Breaker bar wear – Regular inspection and turning will lower operating costs. Throughput (tons per hour) – Overfeeding a crusher can make the output more coarse, but it also causes a number of wear and longevity issues making overfeeding a major concern to avoid. Moisture – Moisture cushions the impact, producing a coarser product. Apron wear – Worn plates can be replaced or moved to areas of lower wear. Spring bridge operation – Spring set height is critical to maintain proper operation of spring bridges. Spring bridges return the aprons to their original positions after an overload situation. The use of altered or non-specified springs can cause equipment damage or catastrophic failure. Requirements for optimum production and wear part utilization include the following: Protect inlet and outlet. Restrict maximum feed size. Maintain feed rate within allowable limits. Check rotor rotation. Use metal detection (required). Check for wear. Follow recommended breaker bar rotation setting sequence. Check rotor breaker bar, wedge, and stop block or jack screws. Check liners and breaker plates. Vertical Shaft Impactor Operation And Maintenance The vertical shaft impactor uses high rotor speeds (1,000 to 3,000 rpm) to apply high energies to the material, and since Energy + Material = Size Reduction, it can create sand from 2-inch feed. Requirements for optimum production and wear part utilization include the following: optimized parts in rotor tube Limit feed size. Use metal detection (required). Observe any vibrations with the use of continuously monitored vibration sensors. Listen to the equipment, if something sounds unusual, shut down and inspect. Limit recirculating product in a closed system. If using water for dust suppression, introduce it into the discharge area if possible. Introducing water in the intake will increase wear. Place weight match shoes opposite one another. The image above shows rotor tubes indexed 90 degrees providing a new wear surface. Wear parts include the following:recommended parts for vertical shaft impactors Shoes and tubes Anvil ring or other inserts Housing liners Rotor table liners and assembly Spares recommendation: Shoes (one complete set) Table liner Anvils (one complete set) Discharge plate The spare parts inventory shown above is recommended for vertical shaft impactors. Hammer Mill operation and Maintenance Up running hammer mills combine impact and shear to reduce material. Down running hammer mills primarily use shear by immediately taking feed to the screen or grate bars where hammers shear the material, until it passes through the openings. Requirements for optimum production and wear part utilization include the following: Lubricate bearings regularly. Regularly inspection (unclamp or unbolt front upper half housing for access to screens and hammers) liners, hammers, hammer bolts, rotor discs, grate bars, and screens. Spares recommendation: Hammers Screens Liners Grinding plate Summary A partnership begins between the manufacturer and the customer when the crusher is installed in the field. The manufacturer needs the customer’s help as much as the customer needs the manufacturer’s help to achieve the highest performance possible. Maintenance service after the sale, although mentioned last, is a central part of crusher system performance. And just in case, the manufacturer will have the people and the parts available 24/7 to assist with any problems. Regardless of the field application, the training of personnel is key to successfully and optimally operating equipment. For the size-reduction industry, crusher maintenance problems are mostly related to inadequate training. This exists at plants both large and small. The most effective education is a current and ongoing program for crews — and that’s what will result in legendary performance.
How Much Does It Cost To Operate a Crusher?
Stedman Machine Company
How Much Does It Cost To Operate a Crusher? By Chris Nawalaniec Crushing equipment is the heart of an industrial material-processing system. The size reduction choice you make will have a profound impact on the profitability of your business. When the right choice is made, you should expect many years of profitable operation. How do you make the right crusher choice? Crushers are not glamourous. They are brute force workhorses and what they do is simple, really. Size-reduction equipment in all forms is adding energy to a material to make big pieces smaller. Simple, right? Cost versus Value What does it cost or what is it worth? Producers need to keep that simple equation in mind. We all have to keep our eye on the ball and stay focused on profitability. What are Crushing Costs? Capital acquisition cost Base machine Structures and chutes Motors, drives, guards Energy consumption per unit produced Electricity Compressed air Wear parts cost Normal maintenance Planned downtime Lubrication costs Oil Grease Major repairs Infrequent maintenance Unplanned downtime Labor Normal maintenance Special or unique tools required When the above costs are all accounted for, they are used to quantify the production costs related to size reduction and are expressed in cost per unit of measure production. For example, $0.50 per tph. What Does Value Mean? There are always opportunities to buy a machine at a lower upfront cost. This usually translates into paying higher operating costs over the life of the equipment. Higher service labor cost. Higher wear parts costs. Higher energy costs. Often there is a justifiable case to spend additional capital dollars for the better machine. When evaluating crushing equipment suppliers, crusher manufacturers should quantify both costs: purchase price and operating costs. Before you purchase, ask for reference customers to visit. Selecting Equipment Why are there so many types of equipment? Our team brainstormed this question, and we came up with more than 50 tools or machines that are used for size reduction. What we are addressing here is industrial size reduction of dry, solid materials, which are grown, mined or chemically synthesized, and need to have a physical dimension alteration to be put to use. Customers are asked five questions to begin the equipment selection process. What is the material? What is the moisture content? What is the maximum size going into the machine? What is the size range desired after crushing? What is the desired production rate of finished product? When it’s time to dive a bit deeper to define the problem, we ask some additional questions. How long do you expect to operate the plant? Are you looking at mobile, skid-mounted or fixed installation? Are there electrical limitations or special power requirements at the plant site? Is the system open or closed circuit? Do we need to consider future expansion plans now? The variables above all affect your costs. Let’s take the first question as an example. How long do you plan to operate? There are times when mines reserves, stockpiles, permits, project contract terms affect expected life. If a project is limited by any factor, then “good enough” could be the best choice. As long as the equipment is safe and there are machine wear parts and service available, then going “cheap” may be the best choice. Another factor to consider with low-cost is limited post-sale assistance if there is some process change or major equipment problem. You don’t want to be hung out to dry. Aggregate producers typically expect to be running and profitable for many years. Always buy a crusher from an established company, develop a relationship, and expect ongoing service and personal contact. Ask before you buy about how they approach post-sale parts sales and service. Ask the company quoting how they intend to offer service for their crusher. How many field service people do they have? Are they local, regional or too far away? Not having responsive suppliers will have a significant impact on your plant profitability. Summary Investing in the best size reduction equipment for your specific needs is a big decision. The above should give you a lot to think about so equipment solutions can be objectively analyzed. Chris Nawalaniec is vice president of sales and marketing at Stedman Machine Co.
Teamwork Helps Integrate Design, Manufacture and Installation of Size- Reduction Systems
Stedman Machine Company
Teamwork Helps Integrate Design, Manufacture and Installation of Size- Reduction Systems By Eric Marcotte, Inside Sales Manager, Stedman Machine Company Designing and deploying size-reduction systems takes experience. Many people can collect and install some of the pieces they feel are needed to create a working system, but experience with the interrelationships between components is harder to find. And to ensure safety and performance, crushing, screening, storage and handling systems need to be professionally engineered. A system is always more than just a collection of parts; they must work together whether it’s a properly designed chute or an elaborate processing plant. Retrofitting new crushers, conveyors, screens or other pieces of equipment is also not always an easy process. Even if drawings and specifications no longer exist, plant designers need to make sense of what is there and know what it takes to make new pieces fit in an existing puzzle. If continuing production during the upgrade is required, system bottlenecks will need to be prevented. For example, raw material or finished product stockpiles may be required to keep downtime to a minimum. Also, access and space requirements need to be confirmed and double-checked. First - Assemble a Team Engineering and expertise in a variety of areas are required to develop size reduction systems, including: crushing, screening, structures, conveyors, chutes, hoppers, dust collection and storage, whether for a small equipment retrofit or a large turnkey facility. CAD and process design software applications are must have. Limit multiple layers of personnel. Work directly with the engineers and personnel to select the equipment and design the system. Project management, installation, scheduling and tracking experience will be needed. Be sure supervisors and installers are MSHA trained and have experience in fieldwork. Second - Process Design While most projects present new challenges, a widely experienced team will bring in ideas from other industries. Typical projects involve the following processes and types of equipment. industrial crusher Load out and material receiving This can be a feed hopper with an apron feeder, belt feeder, vibratory or screw feeder, truck dump or railcar unloading system. Bulk material transportation Designing, building or procuring belt conveyors, stackers, apron conveyors, screw conveyors, and pneumatic handling conveyors. Crushing Crushing is the basic building block of a size-reduction system. Experience with a large range of crushing equipment offers many solutions. Properly feeding material into the crusher greatly increases its efficiency, contributes to even wear and maximizes wear metal costs. Bulk material storage Specifying, providing and installing a range of silos, hoppers or other bulk storage solutions. aggregate crusher Screening Experience with many screening manufacturers to include the right screening solution into the system. Dust Collection Including the proper dust collector and dust collection system is a key component to allow a crushing system to work properly. Experience with many dust collection vendors will facilitate properly sizing, connecting and installing the best dust-collection system solution. Controls and Electrical Components To make sure that all components of a system work together, work with control system engineers, panel builders and electrical contractors to create a working, integrated system. Buildings, Foundations and Structure Design, procurement and specifications for buildings, foundations and structures for the equipment supplied on any system. Third - How to Do It Every project has a different set of circumstances that are unique to it. Try to follow a simple checklist to ensure the best possible solutions to the problems. Initial project team meeting. Crusher and screening testing as required. Define required scope for the system. Create preliminary concepts and drawings. Review with operators and supervisors. After receiving feedback, fine-tune the drawings, concepts and put forth a detailed proposal. Set up kick off meetings as required. Proceed with the purchase of major components. Proceed with a detailed system arrangement. Detail major assemblies. Assemblies put out for detail drawing creation. Drawings are self-checked and then crosschecked for accuracy. Assemblies are re-entered into system layout from detail assemblies to verify fit. Approval drawings sent out as required. Vendor drawings checked and approved. Items checked as they are received. Work with vendors and shipping to verify shipment accuracy. Pictures are taken of all shipments for record purposes. Installation supervisor works with install crew to identify, locate and erect items as needed. As installation finish date nears, begin check of motor rotations, sensors etc. Final customer acceptance – formal reviews to finalize “punch list,” follow up items and document the system is performing as specified. Example - Typical Quarry Expansion A limestone quarry running since the 1950s and producing 500,000 tons per year wanted to increase yearly production capacity up to 1.5 million tons with a new automated plant. The new design needed to have the capability to stockpile hundreds of thousands of tons of finished product. The focus was on creating a state-of-the-art plant with designed-in flexibility to do different product sizing. The automated plant needed to have the ability to run production all day as well as to be able to change the product sizes within 10 minutes. The design and fabrication of a new plant may take up to two years to complete as each idea is considered and "wish lists" are sorted out. You don’t want to come back and say we should have done this or done that. Get the very best of everything you can get into the plant for longevity. The project will include numerous conveyors, sensors, controls, vibrating screens, feeders and other equipment. size reduction machine Installed electronics and control systems feed a programmable logic controller. Each conveyor at the plant is equipped with terminal strips that are all wired to communicate information to one main processor, bringing all of the information together in one place to make it easy to operate. All of the feeders and conveyors are monitored to collect all of the information required to operate the plant. With the ability to monitor the speed of the conveyors and feeders, the quarry can keep an eye on production and troubleshoot maintenance issues. The reason for having an automated control system is that if something goes wrong on one of the conveyors, you’ll see it fast enough to prevent a catastrophe that might require digging out a conveyor. If something does go wrong, the computer can take over and begin dropping conveyors, discharging material and shut the feeder down. Since the quarry can now monitor the conveyors moving, the speeds and the tons per hour, limitations can be set to help catch problems before they become too serious. If something is going wrong, say conveyor 2A is slowing down, you can put limits on how much you want to allow it to slow down before the feeder is paused and then limit how long that feeder stays paused. In the end, the quarry was able to more than double their production capacity with the help of the automated plant. The plant was built, delivered and installed as planned with no problems. This is an ideal situation if a quarry is sitting on huge reserves of limestone and plans to operate the crushing plant well into the future. Projects such as this are successful when the customer’s needs are defined and understood, and the project team – including the customer and all supplier partners work to accomplish the project goals.
Making Equipment Replacement Decisions
PAUL D TOMLINGSON
Competition among industries has become globally oriented. Thus, every industry will be examining how they can become more profitable. Increasing the productivity of equipment will be among the logical steps. In turn, older, less productive equipment will be replaced. Modern production equipment will be expensive as well as more complex. Thus, as new capital outlays are considered, there must be more careful consideration than ever before. The singular economic approach to replacing equipment involving primarily accounting personnel must give way to a company team approach. To assure that the best equipment for the job at the best price is purchased, economic as well as performance considerations must be weighed. Maintenance is especially sensitive to this requirement since the new equipment is likely to have many new technological advances that will make it more difficult to maintain. Thus, new maintenance techniques must be introduced and maintenance personnel must be properly trained in applying these techniques. Therefore, plant managers should provide policies that ensure each department recommends features of the new equipment that impact performance and maintenance. Although decisions must embrace performance and maintenance, acquisition cost and long term capital expenses remain an important ingredient. Then, as team decisions are made, there will be better assurance that the right choices are made and that the equipment will effectively support the productivity and profitability requirements of the future
Performance Associates International Assists Torex Gold With Start-Up Success
PERFORMANCE ASSOCIATES INTERNATIONAL
Far too often, natural resource companies start up new plants without a properly trained operations and maintenance team. The results can be disastrous for both safety and revenue. Obviously the ultimate objective is a plant that operates in a safe and profitable manner. In most cases, the pre-start-up safety training is satisfactory, resulting in few if any accidents during start-up and ongoing operations. However, many plants drop the ball when it comes to properly training operations and maintenance personnel. The payback on a properly executed training program far outweighs the cost. If you are going to budget for high-quality engineering, efficient procurement, and experienced and proven construction management (including commissioning), why leave training open to chance? Performance Associates International (PAI) developed an extensive operations and maintenance training program for Torex Gold’s El Limón-Guajes project in the state of Guerrero, Mexico. In 2015, PAI industry training specialists traveled to the project site to carry out the training for Torex Gold employees in anticipation of plant start-up and gold production. The venture was a “massive success,” according to Nelson Bodnarchuk, Director, Operational Systems. This video tells the story of that success, including generous feedback from the executive officers at Torex recognizing our role in the partnership.
Gold Mill Grinding—Example of a Detailed eLearning Operator Training Module
PERFORMANCE ASSOCIATES INTERNATIONAL
This video provides an example of the content and structure of a Performance Associates International computer-based operator training program. In this video, we focus on the user experience of our eLearning module for operators in a gold mill grinding circuit. This example demonstrates the following program features: • Language toggle controls. • Interactive process flowsheets. • Process descriptions. • Principles of operation. • Workbook feature. • Equipment (SAG mill) 3D animation. • Process variables. • Control loops. • Interlocks. • Alarms. • Interactive plot plan. The grinding circuit is just one of 11 modules included in the complete plant operator training program. Each individual module covers the technical aspects of a specific plant area. The program also contains modules presenting basic introductions to many applicable unit operations and a variety of basic mechanical skills. Additionally, detailed maintenance training modules cover each significant piece of equipment in the plant. A comprehensive training component to develop supervisory skills is included as well. Building, running, and maintaining a new plant is a significant investment. A work-force well-trained from top to bottom is the best way to protect that investment by ensuring a successful start-up and continued operations at peak performance. If you are building a plant and preparing your operators and supervisors for start-up and operation, please stop and ask the question “what components of this training program do I NOT want my operations team to be thoroughly familiar with?”
Producing High Quality, Lignite Free Sand
MMI
Dexter Sand and Gravel is part of Delta Companies, a subsidiary of Colas USA. Delta owned another sand and gravel operation near the current Dexter, Mo., site that was running out of reserves. So in 2009, Area Manager Mike Martin and Delta Mining Engineer Scott Jinks started looking for a new site close to the old operation. They found it in Dexter, just two miles south of the old site. The company broke ground at the Dexter site in February 2012. By April, crews were pouring concrete for the foundations, and construction was underway in May. The site was producing sand by the end of July. Problem “This site is a great sand deposit with a small amount of gravel that is easily separated,” Martin said. “The challenge with this deposit is that it contains trace amounts of lignite.” Martin said that lignite, a material similar to soft coal, causes problems with concrete sand because it is lighter than the sand and essentially pops out as the concrete sets, causing voids in the finished concrete. Martin and Jinks were concerned with the quality issues caused by lignite and looked at viable options from several aggregate processing equipment manufacturers. Ultimately, they decided to work with McLanahan Corporation, which was represented in Missouri by Mike McCarron, Sales Manager for Continental Equipment. The team came together to design the plant and make sure the equipment could separate the lignite and make the desired products.